adprixarabia.com

Project TABUK

Tabuk Bus Station – Dual-Side LED Screen Installation

Adprix Arabia successfully executed the installation of a dual-sided outdoor LED display at Tabuk Bus Station, enhancing the station’s visibility and communication efficiency.
This project required structural reinforcement, quick problem-solving, and precise technical coordination, all completed within a tight schedule of just 1.5 days.

Client Requirements

The client required a dual-sided LED display for clear visibility from both directions of passenger movement. The installation needed to ensure:

A strong and stable mounting structure suitable for outdoor conditions

Optimal viewing angle for both sides of the screen

Reliable electrical and data connections with weatherproof safety standards

Challenges & Approach

Structural Strength Issue

During the initial site visit, our team identified that the existing support structure was not strong enough to safely hold the dual LED screens.
After a detailed assessment and obtaining additional site permissions, we designed and installed a reinforced mounting frame, ensuring long-term durability and safety against wind load and vibration.

Technical Connectivity Issue

While configuring the screens, we encountered a data synchronization issue between the two display faces.
Our IT and engineering teams reconfigured the sending card settings and optimized CAT6 signal routing to ensure both sides displayed synchronized content without latency.

Power Load Management

The existing power line was not evenly distributed for both sides of the screen. Our electrical team implemented a balanced power distribution setup, preventing voltage fluctuation and ensuring stable performance.

Our Solution

Adprix Arabia’s team completed the project with a focus on structural integrity and operational reliability:

Installed a custom-engineered steel structure designed for dual-sided mounting

Rewired and reconfigured the control system for perfect screen synchronization

Conducted load testing to ensure consistent power flow and performance stability

Completed the entire installation and testing process in just 1.5 days

Outcome

Dual-side LED display operating seamlessly with synchronized visuals

Enhanced visibility for passengers and station management

Reinforced structure ensuring long-term durability and safety

 Project completed on time with high-quality technical precision

Key Highlights

Location:  Tabuk Bus Station

Type: Dual-Side Outdoor LED Display

Special Features:  Structural reinforcement, synchronization calibration, power balancing

Execution Time: 1.5 days

Focus: Strength, synchronization, and speed

Inquire to Make Your Work Beautiful Like This

To Learn More About Our Work, Explore Our Services, or Discover the Other Brands We Build, Feel Free to Reach Out Mail Us at sales@adprixarabia.com or Call +966556694151